Paving will be done between 7 a.m. and 5 p.m. Monday and Tuesday on Linda Court from Meadow Lane to the dead end and the entire length of Meadow Lane.
Is this Mayor Jennings' block? Because it looks an awful lot like an out of the way cul-de-sac with little to no through traffic.
As opposed to, say, North Main, which is a busy avenue and is in absolutely terrible shape.
Seriously. Awful.
No comments:
Post a Comment